Saturday, May 15, 2010

Trusses Pocatello

This is the pile of trusses laying on the ground it takes a lot of work to get them ready to be set.
We build some of the trusses on the ground and the boom truck sets them in place.

Framing Pocatello

The last of the walls going up before trusses are set.
We hire a boom truck to set the trusses up on the walls this usually takes about three hours.

Here is a crooked picture after all of the trusses are up.
After the trusses are set it takes a day to build all of the corners and get ready for sheeting on a hip roof.

Saturday, May 1, 2010

Pocatello Framing

Here is the floor half sheeted. It looked really big once the whole thing had sheeting on it.

Once the floor is complete we lay out all of the walls and figure the layout of windows and doors. It is a lot easier to make changes at this point instead of after the walls are standing.
We did change a few things to make some of the rooms feel more open.
This is the back wall of the house it is 75 feet long. We had to recruit some locals to help stand it. The Solomons brought seven people with them to help. It went up easy with that many people.

Here all but one exterior wall is stood. there is one missing right behind the garage. The well was completed this week, we ended up with 50 gallons per minute a great well.

Saturday, April 24, 2010

Here are most of the basement walls framed. The floor will be framed next. We will come back to the basement and frame the rest of the walls on a rainy day. We have had plenty of those lately.

Pocatello Building

Here is the framing crew hard at work framing the basement walls.
A view from the front of the house right after they dropped the framing materials

This is the second pour in the basement the power trowel that you see is a handy piece of machinery it save a lot of back breaking work.





I guess I am still figuring out how to run a blog. Sorry for the duplicates.

Monday, April 19, 2010

Pocatello construction

Here the floor is graveled and compacted all ready to pour.
We poured the floor in two halves because it is such a big floor 14 yards in the first pour the second pour will be 13 yards.


We hired Maverick well drilling out of Lava to drill the well. He drills all of my wells. He only works part time it seems so I always get him there early in the job to make sure we have water before the move in date. he has never let me down. We will start framing this week so it will really start to look like a house in the next few weeks.

Wednesday, April 14, 2010

Demolition Pocatello

The funnest thing I have done with my equipment is demolition our task was to take down this little barn so they could build a new one.
It took about half an hour to bring it all the way down.

This is the spot where the barn was and the new one will soon be. I could do jobs like this every day.